Chitwan. The dry landslide at Ghoptevir located at Ichchakamana-4 under the Prithvi highway has been removed and the road has been brought into two-way operation. The road, which was blocked due to landslides this morning, is now open for two-way operation from 2:15 p.m. Earlier, the road was open one-way from 12 noon.
According to Chief Superintendent of Police Rameshwar Paudel of the District Police Office, with the two-way operation of the road, the stopped vehicles are moving towards their destination easily. Earlier, the vehicles were sent to their destination by queuing up when the road was one-way.
According to engineer Sachindra Mishra, information officer of the western section of Naubise-Muglin road project, it was difficult to clear the road due to a dry landslide falling from a height of about 35 meters. Although the wall was not cut in that place, the landslide fell from above. He informed that since the place is weak, there is a risk of landslides at any time.




