Mahendranagar. A budget of Rs 5 crore has been requested for the Dodhara Chandni suspension bridge on the Mahakali river in Kanchanpur, which is awaiting reconstruction.
On October 14th, the flood in the Mahakali river destroyed one pillar of the bridge, and the traffic is completely closed. Shankar Budhathoki, Head of Planning of Suspension Bridge Division, informed that a budget request of Rs.
“We have not been able to prepare a detailed cost report by deputing a technician since the water is still flowing around the broken pillar that needs to be tested for soil,” said Budhathoki, head of the project.
After the damage to the bridge, a two-member technical team headed by Kamal Kumar Adhikari, Deputy Director General of Suspension Bridge Division, reached Kanchanpur to study it. The team had estimated that the damage to the bridge was worth Rs 7 crore and it would cost around Rs 20 crore to restore it and make it operational.
The technical team that came here has pointed out that along with the fallen pillar of the bridge, two more pillars on the right and left sides are also in a weak condition.
Similarly, the Sudurpaschim state government has allocated a budget of Rs 1 crore for the reconstruction of the Dodhara Chandni suspension bridge. Dodhara Chandni Suspension Bridge is also a well-known bridge in the country as a tourist destination.




