Kathmandu. The flights and landings of the Tribhuvan International Airport have been affected by the sudden heavy rain and hail in Kathmandu on Wednesday afternoon. Airport flight operations were temporarily suspended from around 2 pm after heavy hail covered the runway and taxiway.

At least eight planes scheduled to land at the airport have been held up in the sky due to hail and rain. According to the airport, there are four international and four domestic flights among them.

According to the spokesperson of Tribhuvan International Airport, Sanjay Kumar, the operation of the airport had to be stopped for safe flight and landing after heavy hail covered the runway. Fire engines of the Airport Rescue and Fire Fighting Service (RFF) have been mobilized to remove hail from the runway. He informed that since there is no separate equipment to remove hail, the runway is being cleared with the help of fire brigade.

Due to bad weather, the Buddha Air plane which is preparing to fly to Rajviraj and the Thai Air plane which is about to leave for Bangkok have also returned to the parking area.

Due to rain with hail, water has also entered inside the internal terminal building of the airport. The check-in counter area of ​​the domestic terminal has accumulated water and the floor is flooded. Due to this, there is also a problem in the movement of passengers who are waiting for flights to different destinations.

Similarly, the airport officials have said that water has also leaked from the panel lights installed on the roof of the security check area. According to an official of the Nepal Civil Aviation Authority, the operator of the airport, there was a problem inside the terminal building due to water leaking from the roof. He said that work is being done to facilitate the movement of passengers by removing the frozen water.

The internal terminal building of Tribhuvan Airport was also flooded during last year’s rainy season.

The sudden hailstorm and heavy rain have affected everything from airport flight management to passenger movement. The airport administration said that it is working to clean the runway and create a safe flight and landing environment. It is not yet clear when regular flights will resume.